ELECTRICAL CONTRACTORS

Electrical O&M manual service for UK contractors

Upload the job's electrical installation certificates, test results, datasheets and as-built drawings, and we compile them into a sectioned electrical O&M manual your client's facilities team can use from day one.

Typically 5 working days. Need it sooner? 24-hour turnaround available on request.

BS 7671 RECORDSCertificates and schedules filed by board
FIXED PRICEPackage confirmed before work starts
PREVIEW FIRSTCheck a watermarked copy, then pay
ONE SECTIONED PDFReady to issue at handover

What's in an electrical O&M manual

Ten sections, from the scope of works to the warranties.

An electrical manual records what was installed, how to operate and maintain it, and the evidence that it was inspected and tested. We arrange your documents in the order a facilities team looks for them.

Where a board, circuit or luminaire appears in the schedules, its certificate and datasheet are filed where someone tracing it would expect to find them.

See an example electrical manual
  1. 01Project details and contents
  2. 02Electrical scope of works
  3. 03System descriptions
  4. 04Distribution and board schedules
  5. 05Lighting and emergency lighting
  6. 06Certificates and test results
  7. 07Commissioning records
  8. 08Datasheets and product manuals
  9. 09As-built drawings
  10. 10Maintenance, warranties and contacts

Systems covered

Fit-out to full commercial electrical.

Specialist systems installed alongside the electrical package can sit in the same manual or have their own. Each has a page explaining what we need.

Power and distributionSwitchboards, distribution boards, sub-mains, small power and containment
LightingGeneral, external and emergency lighting, and lighting controls
Fire alarmDetection and alarm systems and their interfaces Fire alarm manuals
Solar PV and EVRooftop arrays, inverters and charge points Solar PV
Data and securityStructured cabling, access control and CCTV Data cabling
Critical powerUPS systems and battery installations UPS manuals

Standards and records

Where the electrical records come from.

BS 7671The IET Wiring Regulations. Your electrical installation certificates and schedules of inspections and test results are the core of the manual and are filed by distribution board.
BS 5266-1Emergency lighting. Completion and commissioning certificates, and the routine test regime, are kept with the emergency lighting section.
CDM 2015The principal designer prepares the health and safety file. Your O&M manual is often issued as part of it, so it needs to stand on its own.

We present your records as issued. Inspection, testing and certification stay with the qualified person who carried them out.

Example

A redacted electrical manual.

Pages from a real handover with client details removed.

Schedule of circuit details and test results
Schedule of test results, section 5
Test and commissioning certificates divider
Certificates divider, section 5
Emergency lighting completion certificate
Emergency lighting certificate, section 5

PRICING

Most fit-outs and single-building electrical jobs fit the Standard or Extended package. You'll know the price before we start. See pricing

HOW IT WORKS

Create a project, upload the electrical documents, check the watermarked preview, then pay and download. How it works

WATCH

See the portal in actionA 1:23 walkthrough, from sign-up to download.

Get a fixed price for your manual

Tell us your handover date and we'll reply with a package and price. We endeavour to reply within 24 hours.

We'll use these details to reply to your enquiry. See our privacy notice.

Electrical questions

Asked by electrical contractors.

Running the whole building services package? See M&E O&M manuals, or browse by project type. See our full O&M manual service, or read how to make an electrical O&M manual.

Do I need every certificate before I create the project?
No. Upload documents as they arrive. We produce the manual from what's in the project when you submit it, so submit once the set is complete.
Our board schedules are handwritten. Can they go in?
Yes. Clear scans are fine and are filed as you supply them.
Do you produce the as-built drawings?
No. As-built drawings come from you or your designer, and we include them as supplied.
Is the O&M manual the same as the health and safety file?
No. The health and safety file is the principal designer's record for future construction work. Your O&M manual often forms part of it, but it's a separate document.
Can the manual carry our company name?
Yes. Your company details appear on the cover and project information pages.

Electrical handover coming up? Hand us the paperwork.