Example Electrical O&M Manual

See what a finished Electrical O&M Manual from Project-OM looks like. The example below is based on a fictional project — Thornfield Commercial Fit-Out, Unit 4 Riverside Business Park — and shows the cover page, contents page, scope of works, system descriptions, document register and certificate register.

Cover page

Every manual opens with a cover page identifying the project, the contractors involved and the document reference.

Operating & Maintenance ManualTCF-ELEC-OM-001

Electrical Installation

Thornfield Commercial Fit-Out

Unit 4, Riverside Business Park, Riverside Way, Manchester, M5 3AB

Main contractor
Hallcrest Construction Ltd
Electrical contractor
Voltedge Electrical Services Ltd
Document reference
TCF-ELEC-OM-001
Issue date
Revision 02 — 14 March 2026

Contents page

A clear contents page sets out every section of the manual and where it can be found.

Contents

  1. 1. Project Details3
  2. 2. Document Revision Record4
  3. 3. Electrical Scope of Works5
  4. 4. System Descriptions6
  5. 5. Asset & Equipment Schedule9
  6. 6. Manufacturer Datasheets11
  7. 7. Test Certificates18
  8. 8. Commissioning Records24
  9. 9. As-Built Drawings29
  10. 10. Warranty Information31
  11. 11. Maintenance Recommendations33
  12. 12. Emergency Contacts35

Scope of works summary

A short summary explains what the manual covers before moving into system-by-system detail.

Section 3

Electrical Scope of Works

This Operating & Maintenance Manual covers the electrical installation works carried out by Voltedge Electrical Services Ltd at Unit 4, Riverside Business Park, Manchester, as part of a Category A to Category B commercial fit-out of the ground and first floor office suites. The scope includes new low-voltage distribution boards, general lighting and lighting controls, emergency lighting, small power distribution, containment, and first and second fix cabling throughout the demised area. Works were carried out under main contract reference HCL-2026-014 and reached practical completion on 12 May 2026.

System descriptions

Each electrical system installed is described separately, with details of distribution, control and the relevant standards.

Section 4

System Descriptions

4.1 General lighting

The general lighting installation comprises recessed LED panels and surface-mounted LED battens throughout the office floor plates, controlled via a DALI lighting control system with PIR and daylight-linked sensing to open-plan areas. Lighting circuits are distributed from DB-LG1 (ground floor) and DB-LG2 (first floor).

4.2 Emergency lighting

Emergency lighting is provided by self-contained LED luminaires with integral 3-hour battery packs, installed along escape routes, at final exits and over fire-fighting equipment in accordance with BS 5266-1. The system operates in non-maintained mode and was tested and certified as part of the commissioning records included in Section 8.

4.3 Small power

Small power distribution comprises wall-mounted twin sockets, floor box outlets to open-plan desking areas, and dedicated supplies to kitchenette and comms room equipment. Circuits are distributed from DB-SP1 (ground floor) and DB-SP2 (first floor), each circuit protected by RCBO devices.

Document register

A register lists every supporting document included in the manual, with its reference, revision and date.

Section 5

Document Register

DocumentReferenceRevisionDate
Electrical Job SpecificationTCF-SPEC-E-01Rev 0302 Apr 2026
LED Panel Datasheet — Tamlite TP600DS-LIGHT-001
Emergency Light Datasheet — Ovia InceptorDS-EL-002
Distribution Board Schedule — DB-LG1SCH-DB-LG1Rev 0228 Apr 2026
As-Built Lighting Layout — Ground FloorDWG-E-101Rev B05 May 2026
As-Built Small Power Layout — First FloorDWG-E-205Rev A05 May 2026

Certificate register

A register lists every certificate included in the manual, with its reference, issue date and issuing contractor.

Section 7

Certificate Register

CertificateReferenceDate issuedIssued by
Electrical Installation CertificateEIC-TCF-00108 May 2026Voltedge Electrical Services Ltd
Minor Works Certificate — Kitchenette SupplyMWC-TCF-01430 Apr 2026Voltedge Electrical Services Ltd
Emergency Lighting Commissioning CertificateELC-TCF-00209 May 2026Voltedge Electrical Services Ltd
Fire Alarm Interface Test CertificateFAT-TCF-00309 May 2026Pinnacle Fire & Security Ltd

Your manual is delivered as a single, clearly sectioned PDF — structured like the example above and ready to issue to your client or main contractor.