WATER SERVICES AND DRAINAGE

Plumbing and public health O&M manuals

Water services, drainage and water hygiene handover documentation, compiled from your test, disinfection and commissioning records and the manufacturer's information.

Typically 5 working days. Need it sooner? 24-hour turnaround available on request.

What's in the manual

Records the water hygiene regime starts from.

Once the building is occupied, the duty holder's water hygiene regime begins. The manual gives them the schematics, disinfection and test records, and valve schedules it depends on.

  1. 01Systems description
  2. 02Hot and cold water services
  3. 03Above and below-ground drainage
  4. 04Test and disinfection certificates
  5. 05Water hygiene information
  6. 06Plant schedules
  7. 07Schematics and as-built drawings
  8. 08Product datasheets
  9. 09Maintenance and warranties

Before you upload

Worth confirming first.

Water hygiene records are checked closely by assessors, so make sure the set reflects the finished installation.

  • The disinfection certificate post-dates the final connections
  • Lab results are attached to the disinfection record
  • TMV records list every valve location and set temperature
  • Drainage test certificates cover each stack
  • Plant serial numbers match the plant schedule
  • Water heater documentation is included

Who uses it

Read by duty holders and water hygiene contractors.

The duty holder managing legionella risk, their water hygiene contractor and the FM team maintaining pumps and water heaters all work from the same records.

SYSTEM
PLUMBING & PUBLIC HEALTH
FORMAT
SECTIONED PDF
STATUS
ISSUED FOR HANDOVER

Standards and records

Regulations and guidance behind the records.

Water Supply (Water Fittings) Regulations 1999Govern the installation of water fittings. Approval and notification records are filed as supplied.
HSE ACoP L8 and HSG274 Part 2Control of legionella bacteria in hot and cold water systems. The manual gives the duty holder the installed system's records for their risk assessment.
BS EN 806 and BS 8558Design, installation, testing and disinfection of water systems inside buildings. Your test and disinfection certificates sit against them.
BS EN 12056Gravity drainage systems inside buildings. Drainage test records are filed with the drainage section.

The manual doesn't replace the legionella risk assessment, which remains the duty holder's responsibility.

PRICING

Most plumbing-only packages fit the Standard package. Larger buildings with plant rooms may be Extended. See pricing

HOW IT WORKS

Set up a project, upload test and disinfection records, review the watermarked preview, then pay and download. How it works

WATCH

See the portal in actionA 1:23 walkthrough, from sign-up to download.

Get a fixed price for your manual

Tell us your handover date and we'll reply with a package and price. We endeavour to reply within 24 hours.

We'll use these details to reply to your enquiry. See our privacy notice.

Plumbing questions

Asked by plumbing contractors.

Part of a full building services handover? See M&E O&M manuals.

Does the manual replace a legionella risk assessment?
No. The risk assessment is the duty holder's responsibility. The manual gives the assessor the installed system's records.
Can water sample results be included?
Yes. Upload the laboratory reports and they're filed with the disinfection certificate they relate to.
Do you cover below-ground drainage?
Yes, if it was in your scope and you supply the records.
Can each TMV's maintenance information be included?
Yes. Upload the manufacturer's instructions and your commissioning records, and they're filed in the water hygiene section.

Water services handed over? Get the manual ready.