UPS AND CRITICAL POWER

UPS and critical power O&M manuals

Handover documentation for UPS systems, battery installations and critical power distribution, compiled from the manufacturer's commissioning report, your test records and installation documents.

Typically 5 working days. Need it sooner? 24-hour turnaround available on request.

What's in the manual

Operating procedures first, reference material after.

In a power event, nobody wants to search an appendix. Critical power manuals put the system overview and bypass procedure up front, with the test history and datasheets behind them.

  1. 01System overview and single-line diagram
  2. 02Operating modes and bypass procedure
  3. 03Commissioning report
  4. 04Load and battery test records
  5. 05Battery installation and environment
  6. 06Distribution and protection
  7. 07Equipment datasheets
  8. 08Maintenance and battery replacement
  9. 09Warranties and emergency contacts

Before you upload

Confirm these before upload.

Critical power records get used under pressure, so accuracy at handover matters more than volume.

  • The bypass procedure is the issued version
  • Battery type and installation date are stated
  • The single-line diagram shows final breaker labels
  • The commissioning report is signed off
  • Alarm and remote monitoring set-up is documented
  • Emergency support numbers are current

Handing over the wider electrical installation too? Work through the electrical O&M manual checklist.

Who uses it

Used by operations teams and service engineers.

Facilities and data centre operations staff need the operating procedures to hand. The service engineer relies on the battery records and test history when planning maintenance and replacement.

SYSTEM
UPS & CRITICAL POWER
FORMAT
SECTIONED PDF
STATUS
ISSUED FOR HANDOVER

Standards and records

Standards for UPS and battery records.

BS EN IEC 62040 seriesUninterruptible power systems: safety, electromagnetic compatibility and performance. The manufacturer's declarations are filed with the equipment.
BS EN IEC 62485-2Safety requirements for stationary battery installations, including ventilation. Your battery installation records are filed against it.
BS 7671The upstream and downstream circuits are evidenced by your electrical certificates and test results.
Manufacturer's maintenance requirementsService intervals and battery replacement guidance, filed in the maintenance section.

Test and commissioning results are reproduced as supplied. The manual doesn't verify system performance.

PRICING

A single UPS installation usually fits the Standard package. Data hall projects with several systems are quoted. See pricing

HOW IT WORKS

Create a project, upload the commissioning and battery records, check the preview, then pay and download. How it works

WATCH

See the portal in actionA 1:23 walkthrough, from sign-up to download.

Get a fixed price for your manual

Tell us your handover date and we'll reply with a package and price. We endeavour to reply within 24 hours.

We'll use these details to reply to your enquiry. See our privacy notice.

UPS questions

Asked about critical power manuals.

Part of a larger electrical installation? See electrical O&M manuals.

Can the bypass procedure go at the front?
Yes, and we'd recommend it. Operating procedures can sit ahead of the reference sections so they're quick to find in an outage.
Is a load bank test needed for the manual?
That's a decision for you and your client. If one was carried out, include the report and it's filed with the commissioning records.
Can a standby generator go in the same manual?
If the generator documents are part of your handover, yes. Upload them and they're compiled as their own section.
Do you include battery replacement dates?
If your documents state them, yes. We file the installation date and type you supply so replacement can be planned.