Mechanical O&M manuals for HVAC contractors
Heating, ventilation, air conditioning and controls handover manuals, compiled from your commissioning records, plant schedules and manufacturer documentation.
Typically 5 working days. Need it sooner? 24-hour turnaround available on request.
What's in the manual
Organised around the plant, not the paperwork pile.
Mechanical manuals are used to set up planned maintenance. Each item of plant is traceable from the schedule to its commissioning record, drawing tag and manufacturer's instructions.
- 01Systems description
- 02Plant and equipment schedules
- 03Commissioning records
- 04Cleaning and water treatment
- 05Controls and BMS
- 06Schematics and as-built drawings
- 07Manufacturer O&M information
- 08Maintenance schedules and spares
- 09Warranties and contacts
Before you upload
Cross-check the plant data.
Plant references that don't match across schedules, drawings and commissioning sheets are the most common source of amendments.
- Commissioning sheets show final measured values
- Plant schedule references match the drawing tags
- The controls strategy reflects commissioned set points
- Flushing and water treatment certificates are dated
- Manufacturer documents are for the models actually installed
- Filters, belts and consumables are listed as spares
Who uses it
The starting point for planned maintenance.
The building's FM team and maintenance contractor use the plant schedules to set up planned preventive maintenance, and the commissioning records as the baseline for future checks.
MECHANICAL
SECTIONED PDF
ISSUED FOR HANDOVER
Standards and records
Guidance mechanical handover draws on.
| CIBSE Commissioning Codes | Code A (air distribution), Code W (water distribution) and Code C (automatic controls). Your commissioning records follow them; the manual files them by system. |
|---|---|
| BSRIA BG 29 | Pre-commission cleaning of pipework systems. Flushing and cleaning certificates are filed in their own section. |
| BSRIA BG 49 | Commissioning air systems. Air balancing results are kept with the system they relate to. |
| SFG20 | The planned maintenance standard many FM teams use. The plant schedules give them the asset data they need to apply their maintenance tasks. |
We compile commissioning and test data as issued. We don't commission, balance or certify systems.
PRICING
Single-system mechanical packages often fit Standard; whole-building HVAC is usually Extended. See pricing
HOW IT WORKS
Create a project, upload plant and commissioning records, check the watermarked preview, then pay and download. How it works
Get a fixed price for your manual
Tell us your handover date and we'll reply with a package and price. We endeavour to reply within 24 hours.
Mechanical questions
Asked by mechanical contractors.
Delivering mechanical and electrical together? See M&E O&M manuals.
- Can you include the BMS points list?
- Yes. Upload it from your controls specialist and it's filed in the controls section.
- Our commissioning was done by a specialist firm. Do we need their reports?
- Yes. We compile the commissioning records the specialist issued; we don't produce or interpret them.
- Do you write the systems description?
- We draft it from your specification and records, describing what was installed, and you review it in the preview.
- Can we have a mechanical-only manual on an M&E job?
- Yes. If the electrical contractor hands over separately, the mechanical package can have its own manual.
