EV charger O&M manuals for workplace and commercial sites
Charge point handover packs built from your commissioning sheets, test certificates, back-office set-up details and the manufacturer's documentation for every unit.
Typically 5 working days. Need it sooner? 24-hour turnaround available on request.
What's in the manual
Every charger accounted for, from bay to back office.
Car parks change: bays get renumbered and units get swapped. The manual ties each charger's serial number to its location, circuit and commissioning sheet so the records stay usable.
- 01Site overview and charger schedule
- 02Electrical certificates and test results
- 03Commissioning sheets
- 04Earthing and protection
- 05Supply and load management
- 06Back office and connectivity
- 07Charger datasheets and user guides
- 08Inspection and maintenance
- 09Warranties and support contacts
Before you upload
Line these up before you upload.
Most EV amendments come from serial numbers or bay numbers that don't agree across documents.
- One commissioning sheet for every charger on the schedule
- Serial numbers match between schedule and commissioning sheets
- The earthing arrangement for each circuit is stated
- Network or SIM connectivity details are confirmed
- Bay numbers on the drawing match the signage
- Grant documents are the versions you submitted
Handing over the wider electrical installation too? Work through the electrical O&M manual checklist.
Who uses it
Used by site managers and charge point operators.
Site managers field driver queries and need the user guides. The maintenance contractor works from the schedule and test results, and the charge point operator manages the back office.
EV CHARGING
SECTIONED PDF
ISSUED FOR HANDOVER
Standards and records
Standards behind charge point handover.
| BS 7671 Section 722 | Requirements for electric vehicle charging installations, evidenced by your electrical certificate and test results. |
|---|---|
| IET Code of Practice for EV Charging Equipment Installation | Practical guidance on design and installation. Any design notes you prepared against it are filed with the certificates. |
| Electric Vehicles (Smart Charge Points) Regulations 2021 | Set requirements for smart charge points. Include the manufacturer's statement of compliance and it's filed with that model's datasheet. |
| Approved Document S | Where charge points were installed to meet Part S of the Building Regulations, the supporting records are kept together. |
The manual records what was installed and supplied. It doesn't certify the installation.
PRICING
Up to a handful of identical chargers usually fits the Standard package. Multi-site rollouts are quoted. See pricing
HOW IT WORKS
Create the project, upload the charger records, review the watermarked preview, then pay and download. How it works
Get a fixed price for your manual
Tell us your handover date and we'll reply with a package and price. We endeavour to reply within 24 hours.
- We installed 40 chargers across three car parks. Is that one manual?
- It can be one manual with a section per car park, or a manual per site if your client prefers. Tell us at quote stage.
- Do you need the smart charge point compliance statement?
- If you have it, include it. It's filed with that charger model's datasheet.
- Are rapid DC chargers covered?
- Yes. The manual is compiled from whatever charger documentation you supply, AC or DC.
- Can the back-office platform details be included?
- Yes, the platform name, account owner and support route. Keep passwords out of the manual and hand them over directly.
