Data cabling handover documentation and O&M manuals
Copper and fibre handover packs compiled from your certification test results, labelling schedules, as-built floor plans and manufacturer warranty documents.
Typically 5 working days. Need it sooner? 24-hour turnaround available on request.
What's in the manual
A test baseline the next contractor can trust.
The client's IT team will move, add and change outlets for years. The manual gives them the labelling scheme and the original test results, filed by floor and cabinet.
- 01Installation summary and topology
- 02Labelling scheme and schedules
- 03Copper test results
- 04Fibre test results
- 05Floor plans and outlet layouts
- 06Cabinet and rack elevations
- 07Product datasheets
- 08Warranty documentation
- 09Records administration
Before you upload
Check the set is complete.
Test results and labels are the heart of a cabling handover, so it pays to cross-check them before they go in.
- Test results are the full export, not a summary sheet
- Every link in the labelling schedule has a result
- Fibre results state the test method and reference used
- Outlet IDs on the floor plans match the faceplates
- The warranty application has been submitted
- Rack elevations show the as-installed layout
Handing over the wider electrical installation too? Work through the electrical O&M manual checklist.
Who uses it
Handed to IT teams and future installers.
The client's IT team uses the labelling scheme day to day. A future cabling contractor needs the original results before extending the installation, and the manufacturer needs them to honour an extended warranty.
FROM A CLIENT
“Project-OM took the pain out of producing our O&M manual for a data cabling and CCTV job. Fast, accurate, and professional — exactly what we needed for handover.”
Standards and records
Standards your cabling records sit against.
| BS EN 50173 | Generic cabling systems. Defines the channel and permanent link classes your test results refer to. |
|---|---|
| BS EN 50174 | Cabling installation, including specification, quality assurance and administration. The labelling and records sections follow its administration principles. |
| BS 6701 | Telecommunications equipment and cabling installation in the UK, including the separation and safety requirements your installation followed. |
| Manufacturer warranty programmes | Extended system warranties usually depend on complete test results and registration. The confirmation is filed with the warranty section. |
Whether a link passes is set by the tester and the certifier. The manual presents the results as issued.
PRICING
Most office cabling jobs fit the Standard or Extended package, depending on drawings and test volume. See pricing
HOW IT WORKS
Open a project, upload the test exports and drawings, check the watermarked preview, then pay and download. How it works
Get a fixed price for your manual
Tell us your handover date and we'll reply with a package and price. We endeavour to reply within 24 hours.
Data cabling questions
Asked by cabling installers.
Cabling part of a wider electrical package? See electrical O&M manuals.
- Can test results go straight from the tester software?
- Yes. Export them as PDF and upload them; they're filed by floor or cabinet so a single link is quick to find.
- Do you check whether the links pass?
- No. Pass or fail is set by the tester and the person who certified the installation. We compile the results as exported.
- Is a manufacturer warranty needed for the manual?
- Not for the manual itself. If you've applied for one, include the confirmation so the client knows what's covered.
- Do you cover cabling for Wi-Fi access points and CCTV?
- Yes, any structured cabling you installed, provided the documents are supplied.