Electrical O&M manual for office fit-out projects

CAT A and CAT B fit-outs hand over to two audiences: the landlord's building team and the tenant. We compile your documents into a manual that's clear about which installation belongs to whom.

What's different on a fit-out

Three things a fit-out manual has to get right.

Fit-out handovers are quick and crowded. The manual has to be accurate about scope, because the next person to read it may be a different landlord or tenant.

  1. The landlord–tenant boundary

    The manual states where the base build ends and the fit-out begins, so each installation is maintained by the right team.

  2. Short programmes, late information

    Upload documents as they arrive and submit the project once the set is complete, rather than waiting for everything at once.

  3. Alterations to existing systems

    Where you've extended the landlord's fire alarm or emergency lighting, the records of that alteration are filed together.

Who receives it

Two teams, one set of records.

The tenant's facilities manager looks after the fit-out installation. The landlord's building manager needs the records for anything connected to base-build systems, and the fit-out project manager collects it all for practical completion.

Trade pages

Specialist systems on this type of job.

PRICING

Most CAT A and CAT B electrical fit-outs fit the Standard or Extended package. See pricing

HOW IT WORKS

Create the project with your practical completion date, upload documents, check the preview, then pay and download. How it works

WATCH

See the portal in actionA 1:23 walkthrough, from sign-up to download.

Fit-out questions

Asked on office fit-outs.

Need the whole building services package? See M&E O&M manuals.

What's the difference between a CAT A and a CAT B O&M manual?
A CAT A manual covers the landlord's fit-out to a usable shell. A CAT B manual covers the tenant's own works, such as layouts, power to desks and meeting rooms. Many projects need both, or one manual with clearly separated sections.
Can the manual be ready for practical completion?
Tell us the date when you set up the project. Typically 5 working days. Need it sooner? 24-hour turnaround available on request.
We only extended the existing fire alarm. Is that its own section?
It can be. The alteration records are filed together so the landlord can update their own system records.