Solar PV O&M manuals for installers
Commercial and domestic PV handover packs, compiled from your string test results, inverter commissioning records, grid connection paperwork and MCS certificate where the system has one.
Typically 5 working days. Need it sooner? 24-hour turnaround available on request.
What's in the manual
From the single-line diagram to the warranty registrations.
A PV manual has to serve the owner reading their generation figures and the engineer who isolates the array years later. We order your records with both in mind.
- 01System summary and single-line diagram
- 02Array and string layout
- 03Electrical certificates and PV test results
- 04Grid connection records (G98/G99)
- 05Inverter and monitoring set-up
- 06Equipment datasheets
- 07Mounting system and roof documents
- 08Inspection and cleaning information
- 09Warranties, registrations and contacts
Before you upload
Worth checking before you upload.
Small mismatches between the layout and the test sheets are the usual cause of an amendment round on PV jobs.
- Every string on the layout has a test result
- The DNO paperwork is the accepted version, not the application draft
- Inverter serial numbers are recorded for warranty registration
- Isolator positions match the labels on site
- Battery documents are included if storage was fitted
- Monitoring access is handed over separately
Handing over the wider electrical installation too? Work through the electrical O&M manual checklist.
Who uses it
Read by owners, energy managers and maintainers.
The owner or energy manager checks generation and warranty cover. The O&M contractor uses the layout and test baseline for inspections, and the DNO or an insurer may ask to see the connection records.
SOLAR PV
SECTIONED PDF
ISSUED FOR HANDOVER
Standards and records
Standards your PV paperwork follows.
| BS EN IEC 62446-1 | Testing, documentation and maintenance requirements for grid-connected PV systems. It sets out the system documentation a handover pack should contain. |
|---|---|
| ENA EREC G98 and G99 | Engineering Recommendations for connecting generation to the distribution network. Your notification or application and the DNO's response are filed together. |
| MCS installation standard | Applies where the installation is MCS-certified. The MCS certificate is included as issued. |
| BS 7671 Section 712 | Requirements for solar photovoltaic power supply systems, evidenced by your electrical certificates and test results. |
We file the records you provide. Certification, testing and DNO approval remain with the installer.
PRICING
A single PV system with storage usually fits the Standard package. Larger multi-roof sites may be Extended. See pricing
HOW IT WORKS
Set up the project, upload the PV records, check a watermarked preview, then pay and download the clean file. How it works
Get a fixed price for your manual
Tell us your handover date and we'll reply with a package and price. We endeavour to reply within 24 hours.
Solar PV questions
Asked by PV installers.
Charge points on the same job? See EV charging O&M manuals.
- Do we need an MCS certificate for a commercial system?
- Only if the installation was MCS-certified. Many larger commercial systems aren't, and the manual is compiled from the certificates you do have.
- Can battery storage go in the same manual?
- Yes. Upload the battery and storage inverter documents and they're filed as their own section.
- Should monitoring passwords go in the manual?
- We'd advise against it. The manual can say where the monitoring portal is and who holds access; pass the credentials to your client separately.
- A roofing contractor fitted the mounting system. Can their documents be included?
- Yes. Upload their documents with yours and they sit in the mounting section.